Design Construction

Building-Mounted Photovoltaics by Pira International Ltd

Posted On March 24, 2017 at 9:20 am by / Comments Off on Building-Mounted Photovoltaics by Pira International Ltd

By Pira International Ltd

Show description

Read Online or Download Building-Mounted Photovoltaics PDF

Similar design & construction books

Cold-formed Tubular Members and Connections

Chilly shaped structural individuals are getting used extra broadly in regimen structural layout because the international metal strikes from the creation of hot-rolled part and plate to coil and strip, frequently with galvanised and/or painted coatings. metal during this shape is extra simply brought from the metal mill to the producing plant the place it is often cold-rolled into open and closed part individuals.

Deep Foundations on Bored and Auger Piles - BAP V: 5th International Symposium on Deep Foundations on Bored and Auger Piles (BAP V), 8-10 September 2008, Ghent, Belgium, Book + CD-ROM

Even though progressing rather well over the past years, the layout standards for bored and auger piles are nonetheless no longer totally below keep an eye on and in appropriate synergism with the genuine pile beginning behaviour. even supposing there was loads of study long ago years  world wide on deep origin engineering, the robust and aggressive marketplace has completely favorized the ingenuity of the contractor’s global.

Concrete Mix Design, Quality Control and Specification, Fourth Edition

The character of concrete is swiftly altering, and with it, there are emerging issues. completely revised and up-to-date, this fourth version of Concrete combine layout, quality controls and Specification addresses present practices that supply insufficient longevity and fail to do away with issues of underperforming new concrete and faulty checking out.

Extra resources for Building-Mounted Photovoltaics

Sample text

8 m (6 ft) clearance. 4 will soon be a nationwide requirement. In Europe, there is also increased awareness of these issues. Anyone contemplating building a BMPV system on any rooftop should consult local fire authorities early in the design process. Utility/interconnection Issues When planning a new building project with BMPV, the local electric utility should be consulted early in the conceptual design process. A contract between the utility and the generating entity is essential to protect both organizations and is usually required before a grid-tied PV system becomes operational.

Even disconnects serving individual module strings do not provide complete protection. Awareness of the fire hazard potential of BMPV was raised about 10 years ago by fire officials in California. As a result, the Los Angeles Fire Department began strict enforcement of a preliminary set of requirements in 1999. California entities CalSEIA (California Solar Industries Association) and SMUD (Sacramento Municipal Utilities District) developed training materials for firefighters in 2006. 5 are excellent resources for those interested in this topic.

Every system should have an easily located and well-marked disconnect at ground level and in a place where it can be easily reached. This disconnect will isolate the PV array from the grid, but will not necessarily eliminate the BMPV system as a hazard. Large commercial inverters usually contain capacitors that may take as long as 15 minutes to discharge. After disconnect, an array will usually shift to an open-circuit voltage mode, but will still be capable of delivering a shock if a complete contact is made.